- 
Arabic
 - 
ar
English
 - 
en

EPC Works For 525 KWP Solar PV Ground Mounted Plant At Beeah’s Head Quarter, Sharjah

  • CLIENT
    Abu Dhabi Future Energy Company PJSC – “MASDAR”
  • LOCATION
    Beeah HQ, Sharjah
  • Contract Type
    EPC Contractor

Project Overview

The PV modules are mounted on ground using micro pile GI structure-2modules in portrait facing True south. The total installed peak power of PV plant is 525 kWp. The system is split into two parts, grid-tie and off-grid.  The grid-tie system is connected to existing grid and offset the consumption of grid utilization. The off-grid system consists of a Lithium battery bank with a capacity of 300 kWh to power the landscaping loads.

You might
be interested...

This will close in 20 seconds

This will close in 20 seconds