The PV modules are mounted on ground using micro pile GI structure-2modules in portrait facing True south. The total installed peak power of PV plant is 525 kWp. The system is split into two parts, grid-tie and off-grid. Â The grid-tie system is connected to existing grid and offset the consumption of grid utilization. The off-grid system consists of a Lithium battery bank with a capacity of 300 kWh to power the landscaping loads.

This will close in 20 seconds
This will close in 20 seconds