- CLIENT
Abu Dhabi Future Energy Company PJSC – “MASDAR” - LOCATION
Beeah HQ, Sharjah - Contract Type
EPC Contractor
Project Overview
The PV modules are mounted on ground using micro pile GI structure-2modules in portrait facing True south. The total installed peak power of PV plant is 525 kWp. The system is split into two parts, grid-tie and off-grid. The grid-tie system is connected to existing grid and offset the consumption of grid utilization. The off-grid system consists of a Lithium battery bank with a capacity of 300 kWh to power the landscaping loads.
You might
be interested...
- Date
- July 6, 2023
Khazna Data Center Abu Dhabi CLIENTAbu Dhabi Future Energy Company PJSC – “MASDAR” LOCATIONKhazna Data Center, Abu Dhabi Contract Type — Project Overview The project consists of […]- Date
- July 6, 2023
EPC– 7 MWP Ground Mount Single Axis Tracker PV Plant CLIENTEmerge Limited (Masdar & EDF Group) LOCATIONKhazna Data Center, Masdar City, Abu Dhabi Contract Type — […]

